Energy / Grid

Systems engineering for the grid edge

NERC CIP compliance, IEEE 1547 interconnection, reliability engineering, and substation commissioning for grid and power systems.

7 lifecycle phases
40 auto-seeded gate criteria
34 SysML stencil blocks
18 project templates
Methodology-backed by
Methodology

From concept to COD in one platform

New energy projects are seeded with the 7-phase lifecycle — Concept, Interconnect, Design, Reliability, Build, Commissioning, Operations. 40+ readiness criteria cover NERC TPL/CIP, IEEE 1547/2800 interconnection, IEEE 693 seismic, IEEE 80 grounding, IEEE 1584 arc-flash. Purpose-built for generation, storage, transmission, and substation programs.

1
Concept
Concept & Feasibility
2
Interconnect
Interconnection Study
3
Design
Requirements & Design
4
Reliability
Reliability Analysis
5
Build
Procurement & Construction
6
Commissioning
Commissioning
7
Operations
Operations & Maintenance
What's Included

Everything projects in your industry actually need

📋

Stage Gates Out-of-the-box

40 readiness criteria auto-seeded on every new project. No blank-page starts.

🧱

Native MBSE Stencils

SysML palette with 34 blocks specific to your domain — drop and go.

🎯

Project-type Templates

18 archetypes pre-configured so you start from the right place.

🤖

AI-assisted, Domain-aware

Our AI advisor knows NERC / IEEE — not generic SE. Prompts, references, and deliverables frame themselves correctly.

Built for

Project archetypes we support

☀️
Solar PV Plant
Utility-scale or distributed solar PV generation
🔋
Battery Storage (BESS)
Grid-scale battery energy storage — frequency regulation, arbitrage, peaker
🔆
Solar + Storage
Co-located solar PV + battery storage (DC-coupled or AC-coupled)
🏭
Substation
New substation or major rebuild (distribution, transmission, switching)
🖥️
Data Center Microgrid
Data-center behind-the-meter power — on-site generation, UPS, BESS, and utility tie
🌊
Offshore Wind
Offshore wind farm with export cable and onshore substation
Inside the pack

Every tool your project needs, shipping today

Every NERC standard and IEEE study gets a dedicated page — with real document generation, evidence attachment, and delete-safe cross-references. No more shared-drive PDFs or auditor-anxiety spreadsheets.

Engineering Studies Protection · Arc flash · Grounding · Ride-through

The four engineering studies every utility / IPP project ships. Dedicated pages — not PDF attachments.

🔌
Protection Coordination Study
Relay / breaker / fuse inventory with fault-duty margin, coordination pairs with CTI, PRC-023 verification tracking.
IEEE C37 / NERC PRC-023
Arc Flash Analysis
Per-bus incident energy, AFB, PPE category, warning label text. Auto-computed from fault kA + clearing time + working distance.
IEEE 1584 / NFPA 70E
🌍
Grounding Study
Step/touch voltage limits, GPR = I × Rg pass/fail, surface-layer reduction factor (Cs), body-weight classes.
IEEE Std 80-2013
🌀
Ride-Through / IEEE 2800
Per-IBR VRT/FRT type-test status, momentary cessation flagging, FERC Order 901 filing tracker.
IEEE 2800 / 1547 / FERC 901

NERC Reliability FAC-008 · TPL-001 · PRC-005 · CIP-014 · MOD-032/033

Every NERC compliance obligation, not just CIP. Ratings methodologies, contingency planning, protection maintenance, physical security, data reporting — each with its own tracker.

📏
FAC-008 Equipment Ratings
Per-equipment normal / emergency / seasonal ratings with documented methodology for every element in the path.
NERC FAC-008
🗂️
TPL-001 Planning Assessment
P0-P7 contingency list with steady-state / dynamics / short-circuit study results and corrective actions.
NERC TPL-001-5.1
🔧
PRC-005 Maintenance
Every protection-system component with interval, last-performed, next-due, and auto-overdue flagging.
NERC PRC-005-6
🔐
CIP-014 Physical Security
Critical-substation list with risk-assessment, security plan, and third-party verification evidence.
NERC CIP-014-3
📡
MOD-032 / MOD-033 Data
Per-submission tracker for steady-state / dynamics / short-circuit models delivered to PC / TP / RC.
NERC MOD-032 / 033
🛡️
NERC CIP Compliance
Per-CIP-requirement tracker with evidence attachment and cadence-based audit preparation.
NERC CIP-002 through CIP-013

Operations & Market Outage mgmt · GADS · ISO markets · PPA · Environmental

The commercial and operational lifecycle — from capacity auctions to EFOR reporting to environmental permits.

📉
Outage Management (GADS)
Planned / maintenance / forced / derate log with auto-computed EFOR and EAF per NERC GADS.
NERC GADS
🏛️
ISO Market Participation
Per-ISO (PJM / ERCOT / CAISO / MISO / NYISO / ISO-NE / SPP) registration with UCAP tags, clearing prices, and ancillary-service enrollment.
FERC OATT / ISO tariffs
🤝
PPA / Offtake Tracker
Energy / VPPA / capacity / tolling / REC contracts with monthly delivery vs guarantee and LD exposure.
Commercial
🌿
Environmental Compliance
NEPA / Title V / NESHAPs / NPDES / SPCC / Section 404 / ESA / NHPA permit register with recurring-report calendar.
EPA / CWA / CAA / ESA / NEPA
💰
LCOE Calculator
Parametric Levelized Cost of Energy with NPV, payback, and multi-scenario comparison.
NREL / EIA methodology

Interconnect & Ops Grid interconnect · Substation commissioning · Reliability

The interconnect-to-commissioning handoff, tracked as engineering work not paperwork.

🔌
Grid Interconnect
SIS / FIS / LGIA milestone tracker with queue position, voltage class, and expected COD dates.
FERC LGIP / SGIP
🏭
Substation Commissioning
FAT / SAT / pre-energization / point-to-point / protection relay / integrated tests with pass/fail/retest/waived results.
Commissioning best practice
📈
Reliability Analysis
MTBF / MTTR / availability / LOLE rollup with series-parallel component modeling.
IEEE 493 / NERC TPL

Depth 54 starter requirements · 35 SysML blocks · 4 doc templates

The pack ships deep — not a checklist wrapper. Pull starter requirements by discipline, drop SysML blocks onto diagrams, generate real-content docs for commissioning, SAT, IFC index, and interconnect applications.

📐
Starter Requirements
54 starter requirements across generation, interconnect, protection, cyber, environmental, controls, safety, commercial, and O&M — plus BESS / wind / solar-specific sets.
IEEE / NERC / OSHA / EPA
🧱
Energy SysML Palette
35 pre-configured blocks — Transformer, IED, PCS, Battery Rack, BMS, SCADA Gateway, CT/VT, ESP Firewall, and more.
OMG SysML
📄
Doc-gen Templates
Interconnection Application · Commissioning Plan · SAT Protocol · IFC Drawing Index — full content, not stubs.
Industry boilerplate
🎯
Project Archetypes
18 templates — Solar PV, Wind, BESS, Combined Cycle, Substation, Transmission Line, Microgrid, Offshore Wind, HVDC, Green Hydrogen, Data Center Microgrid, VPP, and more.
30-day pilot. No credit card required.
Your data in, your data out. Standard formats only.
Self-hosted option for classified programs.

Your first industry pack is free.

Every subscription includes one vertical pack at no extra cost. Add Energy / Grid today — $0 for your first pack, forever.