Systems engineering for the grid edge
NERC CIP compliance, IEEE 1547 interconnection, reliability engineering, and substation commissioning for grid and power systems.
From concept to COD in one platform
New energy projects are seeded with the 7-phase lifecycle — Concept, Interconnect, Design, Reliability, Build, Commissioning, Operations. 40+ readiness criteria cover NERC TPL/CIP, IEEE 1547/2800 interconnection, IEEE 693 seismic, IEEE 80 grounding, IEEE 1584 arc-flash. Purpose-built for generation, storage, transmission, and substation programs.
Everything projects in your industry actually need
Stage Gates Out-of-the-box
40 readiness criteria auto-seeded on every new project. No blank-page starts.
Native MBSE Stencils
SysML palette with 34 blocks specific to your domain — drop and go.
Project-type Templates
18 archetypes pre-configured so you start from the right place.
AI-assisted, Domain-aware
Our AI advisor knows NERC / IEEE — not generic SE. Prompts, references, and deliverables frame themselves correctly.
Project archetypes we support
Every tool your project needs, shipping today
Every NERC standard and IEEE study gets a dedicated page — with real document generation, evidence attachment, and delete-safe cross-references. No more shared-drive PDFs or auditor-anxiety spreadsheets.
Engineering Studies Protection · Arc flash · Grounding · Ride-through
The four engineering studies every utility / IPP project ships. Dedicated pages — not PDF attachments.
NERC Reliability FAC-008 · TPL-001 · PRC-005 · CIP-014 · MOD-032/033
Every NERC compliance obligation, not just CIP. Ratings methodologies, contingency planning, protection maintenance, physical security, data reporting — each with its own tracker.
Operations & Market Outage mgmt · GADS · ISO markets · PPA · Environmental
The commercial and operational lifecycle — from capacity auctions to EFOR reporting to environmental permits.
Interconnect & Ops Grid interconnect · Substation commissioning · Reliability
The interconnect-to-commissioning handoff, tracked as engineering work not paperwork.
Depth 54 starter requirements · 35 SysML blocks · 4 doc templates
The pack ships deep — not a checklist wrapper. Pull starter requirements by discipline, drop SysML blocks onto diagrams, generate real-content docs for commissioning, SAT, IFC index, and interconnect applications.
Your first industry pack is free.
Every subscription includes one vertical pack at no extra cost. Add Energy / Grid today — $0 for your first pack, forever.