TRL & MRL Assessment

Tick what you have actually demonstrated. Your Technology Readiness Level is the highest level whose evidence is complete — not the highest box you can reach. Includes the Manufacturing Readiness Level that normally pairs with it.

Evidence demonstrated

Check every statement that is true and documented today. Undocumented does not count.

Quick set

Assessment

Technology Readiness LevelTRL 6

Prototype demonstrated in a relevant environment

Typical paired MRLMRL 6
Acquisition phase this supportsMilestone B — enter EMD
Highest box tickedTRL 6

Need TRL tracked per subsystem, with the evidence linked to requirements and gate criteria?

Sign up →

Frequently asked questions

Why did my TRL come out lower than the highest box I ticked?

Because readiness is cumulative. A system that has flown (TRL 9 evidence) but never had a documented component validation in a relevant environment (TRL 5) has a gap, and an assessor will rate it at the last level before that gap. This is the single most common disagreement in a technology readiness assessment, and it is usually resolved against the program.

What counts as a "relevant" versus "operational" environment?

Relevant means the environmental factors that drive the design are represented — thermal, vibration, EMI, whatever dominates. Operational means the actual environment, with the actual interfaces and the actual operators. The step from TRL 5/6 to 7 is where most programs stall, because building a realistic environment is expensive and simulating it is contestable.

How does MRL relate to TRL?

They track separately and both gate a milestone. TRL asks whether the technology works; MRL asks whether you can build it repeatably and affordably. A program can sit at TRL 7 with MRL 4 — the thing works but only a lab can make it. DoD milestone criteria typically expect TRL 6 and MRL 6 by Milestone B, and TRL 7+ with MRL 8+ by Milestone C.

What does this tool NOT do?

Per-subsystem rollup, evidence artifacts linked to requirements, TRA report generation, or integration readiness (IRL). Those are in the Defense pack.

Upgrade for a real readiness assessment

  • TRL and MRL tracked per subsystem, rolled up to system level
  • Evidence artifacts linked to the requirements they satisfy
  • Readiness gates wired into DoD 5000.02 milestone criteria
  • Technology Readiness Assessment report generated from live data
  • Gap analysis against the next milestone, not just today
See the full Defense Pack →